According to the relevant provisions of "Environmental Protection Law of the People's Republic of China", "Environmental Impact Assessment Law of the People's Republic of China", "Regulations on Environmental Impact Assessment for Planning" (Order of the State Council No. 559), "Measures for Public Participation in Environmental Impact Assessment" (Ministry of Ecology and Environment, Ministry Order No. 4), "Measures for Public Participation in Environmental Protection" (Order of the Ministry of Environmental Protection No. 35), Xiamen Baofeng Industry (Hubei) Co. Ltd. was commissioned to carry out the environmental impact assessment of the environmental impact report of Xiamen Baofeng (Hubei) aluminum easy-open cover production and processing project, and now the relevant contents of the environmental assessment are publicized for the second time.
I. Name and outline of the construction project
(1) Project name: Xiamen Baofeng (Hubei) aluminum easy-open lid production and processing project
(2) Construction address: Jingu City, Hanchuan City
(3) Construction nature: New construction
(4) Total investment and production scale of the project: invest 1.2 billion yuan to build Xiamen Baofeng (Hubei) aluminum easy-open lid production and processing project in Jingu City, Hanchuan City, the project covers an area of 176,268.7m2, build lid-making workshop, roll coating color printing workshop, and supporting service rooms, the project can form an annual production capacity of 25 billion pieces of easy-open lids after completion.
(5) Conformity of industrial policy and planning
The project is consistent with the "Hubei Yangtze River Economic Zone Development Negative List Implementation Rules (for trial implementation)" and other requirements, according to the "National Industrial Technology Policy" (State Economic and Trade Technology [2002] No. 444), "on the issuance of the relevant state departments to stop duplication of construction projects in the field of industrial and commercial investment, backward production capacity, processes and products and the list of industries prohibited for foreign investment" (the first, second and third batch) The project is neither a repeat construction project nor a backward production capacity, process and product to be eliminated, and there is no relevant content in the directory of prohibited and restricted investment industries.
II. Link to download the draft EIR and public participation questionnaire
Web link to the full draft of the Environmental Impact Report and ways and means of accessing the paper report: the public can access the link: https://pan.baidu.com/s/1AMNwyIvg5L8RLtidfGajQA?pwd=664k (extraction code: 664k), or go to Ltd. to check the paper copy of the report.
III. Scope of the public for comments
The public (or groups) in the region have opinions and suggestions on environmental protection of this construction project (issues not related to environmental protection are not accepted).
IV. Contact information of the construction unit and the environmental impact assessment agency
1. Construction unit
Construction unit: Xiamen Baofeng Industry (Hubei) Co.
Contact person: Yang Jinzhao
Contact: 13789930598
2. Environmental impact assessment unit and contact information.
Unit name: Hubei Xiaoxuan Environmental Technology Co.
Contact: Zheng Xing
Contact number: 0712-2110967
E-mail: hbxh65@163.com
Company website: http://www.hbxhhj.com
WeChat public number: Hubei Xiaoxuan Environment
V. The time and way to submit public comments
1, the public can take the aforementioned construction unit or EIA unit address to send a letter, e-mail, telephone and other ways to express their views on the project and the EIA work. You can also follow "Hubei Xiaoxuan Environment" through WeChat (QR code attached) to conduct a public survey.
2, the public has environmental protection views on the construction project, within 10 days from the date of publication, according to the above contact information to the project construction unit or EIA unit to put forward public opinion, should provide effective contact information to facilitate my unit return visit.
3、I will strictly control the public's personal information after accepting the survey form, and will not disclose it without permission.
VI. The publicity time
The public can make valuable comments to the EIA institution or management unit within 10 days from the date of public notice of this project.
Xiamen Baofeng Group (Hubei) Co.Ltd
July 5, 2022